Prior to loading barges over the stern of a LASH vessel,the vessel should be trimmed in what manner?().
A、Two to four feet by the bow
B、Slightly by the bow
C、No trim should be permitted
D、Slightly by the stern
A、Two to four feet by the bow
B、Slightly by the bow
C、No trim should be permitted
D、Slightly by the stern
A、no earlier than 24 hours prior to loading B、no later than 24 hours prior to loading C、anytime prior to loading D、weekly
A、a boom angle indicator B、a load weight indicator C、material invoices for shipping weights D、prior experience with similar lifts
A、within 4 days after the seaman's discharge B、prior to the vessel's departure on the next voyage C、prior to loading any out-bound cargo D、prior to any change of Master
A、The approved Loading Program could substituted the approved Loading Manual and/or Trim and Stability Booklet B、A Loading Program is required to have General Approval by classification Society prior to being considered for use on a specific ship C、Following a satisfactory installation test on board the ship the Surveyor will issue a Program Installation Test D、A Loading Program may be provided as a classification requirement or as an Owner’s option