搜题
用户您好, 请在下方输入框内搜索其它题目:
搜题
题目内容 (请给出正确答案)
提问人:网友 发布时间:
【单选题】

Which narrative regarding loading software is incorrect?()

A、The approved Loading Program could substituted the approved Loading Manual and/or Trim and Stability Booklet

B、A Loading Program is required to have General Approval by classification Society prior to being considered for use on a specific ship

C、Following a satisfactory installation test on board the ship the Surveyor will issue a Program Installation Test

D、A Loading Program may be provided as a classification requirement or as an Owner’s option

更多“Which narrative regarding loading software is incorrect?()”相关的问题
第1题

A、 customer issue narratives  B、 training and events  C、 ordering information  D、 products and services information  

点击查看答案
第2题

A、WBS (Work Breakdown Structure).  B、cost benefit analysis.  C、requirements specifications.  D、narrative description of the work to be accomplished.  

点击查看答案
第8题

A、A.by which  B、B.to which  C、C.in which  D、D.at which  

点击查看答案
客服
TOP

请使用微信扫码支付

订单号:
遇到问题请联系在线客服