搜题
用户您好, 请在下方输入框内搜索其它题目:
搜题
题目内容 (请给出正确答案)
提问人:网友 发布时间:
【单选题】

All dunnage planks and mats must be sent to board()commencement of loading.

A、prior to

B、during

C、in the period of

D、afterwards

更多“All dunnage planks and mats must be sent to board()commencement of loading.”相关的问题
第1题

A、wooden planks  B、rush mats  C、steel bars  D、wooden planks and rush mats  

点击查看答案
第2题

A、Wooden planks  B、Rush mats  C、Steel bars  D、Wooden planks and rush mats  

点击查看答案
第3题

A、material  B、planks  C、mats  D、dunnage  

点击查看答案
第4题

A、sweep  B、sweeping  C、sweepings  D、dunnage  

点击查看答案
第5题

ADunnage is used to reduce broken space  B、Dunnage is used to benefit ventilation  C、Dunnage is used to segregate cargo  D、Dunnage is used to protect cargo  

点击查看答案
第6题

A、Use either 1 or 2 tiers of dunnage,spacing the pieces in each tier a foot apart,and lay pieces in the bottom tier diagonally to the ship's side  B、Use 1 tier of dunnage,laying the pieces tightly together to form a solid floor over the steel deck  C、Use 2 tiers of dunnage,spacing the pieces in the bottom tier about a foot apart and the pieces in the top tier 6 inches apart  D、Use 2 tiers of dunnage,spacing the pieces in the bottom tier about a foot apart and the pieces in the top tier together  

点击查看答案
第7题

A、the vessel must be moored snugly  B、each tank must be partially full to show it does not leak  C、all dunnage,tools,and extraneous items are secured  D、water under vessel must be deep enough to prevent grounding  

点击查看答案
第8题

A、rat guards  B、stopping guards  C、fenders  D、planks  

点击查看答案
第9题

A、rat guards  B、stopping guards  C、fenders  D、planks  

点击查看答案
客服
TOP

请使用微信扫码支付

订单号:
遇到问题请联系在线客服