搜题
用户您好, 请在下方输入框内搜索其它题目:
搜题
题目内容 (请给出正确答案)
提问人:网友 发布时间:
【单选题】

Which of the actions listed should be taken by the engineer on watch when the general alarm is sounded continuously for 10 seconds?()

A、Engine room ventilation should be started

B、Main engines should be secured

C、The fire pump should be started

D、The fixed CO2 system should be activated

更多“Which of the actions listed should be taken by the engineer on watch when the general alarm is sounded continuously for 10 seconds?()”相关的问题
第1题

A、The NAT action of off is only supported for destination NAT rule-sets.  B、The NAT action of off is only supported for source NAT rule-sets.  C、The NAT action of off is useful for detailed control of NAT.  D、The NAT action of off is useful for disabling NAT when a pool is exhausted  

点击查看答案
第2题

A、FIELD Type :="action"       B、SELECT Type ="action"   C、SELECT Type :="action "        D、@if (type="action";@success;@failure)   

点击查看答案
第3题

A、 form action   B、 view action   C、 hotspot action   D、 db action  

点击查看答案
第4题

A、A.dead band action  B、B.neutral zone action  C、C.range  D、D.on-off action  

点击查看答案
第5题

A、Establish a theory of probable cause  B、Test the theory  C、Implement preventative measures  D、Establish a plan of action  

点击查看答案
第7题

A、Runlevel:Action:Identifier:Command  B、Identifier:Runlevel:Action:Command  C、Command:Action:Identifier:Process  D、Process:Runlevel:Command:Identifier  

点击查看答案
第10题

A、Verify full system functionality.  B、Document the findings, actions, and outcomes.  C、Establish a plan of action to resolve the problem.  D、Question the user and identify changes the user has made to the system.  

点击查看答案
客服
TOP

请使用微信扫码支付

订单号:
遇到问题请联系在线客服