搜题
用户您好, 请在下方输入框内搜索其它题目:
搜题
题目内容 (请给出正确答案)
提问人:网友 发布时间:
【单选题】

The switchboards are those in which all the live parts are installed behind the panels and only the operating handles and instruments are on the front()

A、open

B、open front type

C、live front type

D、dead front type

更多“The switchboards are those in which all the live parts are installed behind the panels and only the operating handles and instruments are on the front()”相关的问题
第3题

A、sub-boards  B、main switchboards  C、emergency switchboards  D、distribution boards  

点击查看答案
第4题

A、A.Governors  B、B.Alternators  C、C.Blackboards  D、D.Switchboards  

点击查看答案
第5题

A、A.Megohm meter, insulation light and synchroscope  B、B.Synchroscope, synchro light and megohm meter  C、C.Shore power switch, insulation light and synchroscope  D、D.Megohm meter, insulation light and shore power switch  

点击查看答案
第6题

A、frequency meter  B、voltage regulator  C、governor control  D、sychroscope switch  

点击查看答案
第7题

A、bridge control panel  B、disconnect links  C、governor relay box  D、main switchboard  

点击查看答案
第8题

A、The breaker should be closed when one synchronizing lamp is dark and the other is bright  B、The breaker should be closed when both synchronizing lamps are bright  C、The frequency meter should be used to determine that the incoming alternator frequency is slightly higher than the bus  D、A portable phase sequence indicator must be used to verify the information from the lamps  

点击查看答案
第9题

A、an electrical switchboard  B、the pressure tanks  C、the fuel oil tanks  D、the oily rag bin  

点击查看答案
客服
TOP

请使用微信扫码支付

订单号:
遇到问题请联系在线客服