搜题
用户您好, 请在下方输入框内搜索其它题目:
搜题
题目内容 (请给出正确答案)
提问人:网友 发布时间:
【单选题】

An alternator switchboard has a synchroscope and synchronizing lamps, if the synchroscope is broken, which of the steps listed is the most essential before an alternator can be paralleled with the bus ()

A、The breaker should be closed when one synchronizing lamp is dark and the other is bright

B、The breaker should be closed when both synchronizing lamps are bright

C、The frequency meter should be used to determine that the incoming alternator frequency is slightly higher than the bus

D、A portable phase sequence indicator must be used to verify the information from the lamps

更多“An alternator switchboard has a synchroscope and synchronizing lamps, if the synchroscope is broken, which of the steps listed is the most essential before an alternator can be paralleled with the bus ()”相关的问题
第1题

A、X.25.  B、Asynchronous transfer mode (ATM).  C、VoIP.  D、Public Switched Telephone Network (PSTN).  

点击查看答案
第2题

A、frequency meter  B、voltage regulator  C、governor control  D、sychroscope switch  

点击查看答案
第3题

A、alternation  B、alternate  C、alter  D、alternative  

点击查看答案
第4题

A、A.shows a light with varying lengths of the lighted period  B、B.shows a light that changes color  C、C.marks an alternate lesser-used channel  D、D.is used as a replacement for another light  

点击查看答案
第5题

A、The switch port link lights will be off on both switches indicating the ports are not connected.  B、The switch port link light will be off on one switch indicating that STP has disabled the port.  C、The switch port link lights will flash amber indicating an error.  D、The switch port link lights will be green indicating normal operation.  

点击查看答案
第6题

A、The switch must be configured with an IP address, subnet mask, and default gateway.  B、The switch must be connected to a router over a VLAN trunk.  C、The switch must be reachable through a port connected to its management VLAN.  D、The switch console port must be connected to the Ethernet LAN.  E、The switch management VLAN must be created and have a membership of at least one switch port.  F、The switch must be fully configured as an SNMP agent.  

点击查看答案
第7题

A、The switch must be configured with an IP address, subnet mask, and default gateway.  B、The switch must be connected to a router over a VLAN trunk.  C、The switch must be reachable through a port connected to its management VLAN.  D、The switch console port must be connected to the Ethernet LAN.  E、The switch management VLAN must be created and have a membership of at least one switch port.  F、The switch must be fully configured as an SMTP agent.  

点击查看答案
第9题

A、switching  B、alternating  C、oscillating  D、fluctuating  

点击查看答案
第10题

A、Sequence  B、Trigger  C、Schema  D、View  

点击查看答案
客服
TOP

请使用微信扫码支付

订单号:
遇到问题请联系在线客服