A(An)()should be issued for every company complying with the requirement of the ISM Code by the Administration.
A、ISM
B、DOC
C、SMC
D、PSC
A、ISM
B、DOC
C、SMC
D、PSC
A、should be kept at a proper level by a cooler B、should be raised to about 80℃ by a heater C、should be raised gradually D、should be lowered to about 60℃
A、The buoy should be considered to always be in the charted location B、If the light is flashing,the buoy should be considered to be in the charted location C、The buoy may not be in the charted position D、The buoy should be considered to be in the charted position if it has been freshly painted
A、The appliance should be tested every three months B、A regular service line should be used when testing C、A regular projectile should be used when testing D、An entry about the test must be made in the Official Log Book
A、fuel pump should be removed and all connections blanked off B、cylinder oil feed rate should be increased slightly above that used at normal sea speed C、cylinder oil feed rate should be reduced D、cylinder oil feed rate should be increased to the maximum flow capable of the metering pump
A、Evacuation should be from an area forward of the bridge B、The vessel should be slowed to bare steerageway C、If the hoist is at the stern,booms extending aft at the stern should be cradled with the topping lifts hove taut D、The litter should not be touched until it has been grounded
A、should be stopped manually B、keeps the combustion as usual C、would be cut off by an interlock D、would replace the waste oil burner and keep going on
A、The breaker should be closed when one synchronizing lamp is dark and the other is bright B、The breaker should be closed when both synchronizing lamps are bright C、The frequency meter should be used to determine that the incoming alternator frequency is slightly higher than the bus D、A portable phase sequence indicator must be used to verify the information from the lamps
A、The safety valve escape piping should be disconnected from the valve body and a blank inserted B、The boiler vent valves should be opened C、All handhole/manhole covers should be tightened up as much as possible to preclude any leaks D、All of the above