搜题
用户您好, 请在下方输入框内搜索其它题目:
搜题
题目内容 (请给出正确答案)
提问人:网友 发布时间:
【单选题】

When hanging off drill pipe in emergency situations aboard a ship,the preferred location of the drill bit is().

A、on bottom with the full drill string in tension

B、one stand (approximately 93 feet) off bottom

C、no deeper than the shoe of the last casing set

D、as close to the surface as possible

更多“When hanging off drill pipe in emergency situations aboard a ship,the preferred location of the drill bit is().”相关的问题
第1题

A、to right the raft if it capsizes  B、to carry the raft around on deck  C、for crewmen to hang on to  D、to hang the raft for drying  

点击查看答案
第2题

A、to right the raft if it capsizes  B、to carry the raft around on deck  C、for crewmen to hang on to  D、to hang the raft for drying  

点击查看答案
第3题

A、to right the raft if it capsizes  B、to carry the raft around on deck  C、for crewmen to hang on to  D、to hang the raft for drying  

点击查看答案
第4题

A、A.Twice the dry bulb temperature  B、B.10℃ above the dry bulb temperature  C、C.5℃ above the dry bulb temperature  D、D.Equal to the dry bulb temperature  

点击查看答案
第5题

A、over the top of the flames  B、off a bulkhead into the fire  C、in front of the fire  D、at the base of the fire  

点击查看答案
第6题

A、aimed at the source of the flames  B、fogged above the equipment  C、shot off a flat surface onto the flames  D、used to shield against electrical shock  

点击查看答案
第7题

A、12 months since last dry-docking  B、18 months since last dry-docking  C、24 months since last dry-docking  D、36 months since last dry-docking  

点击查看答案
客服
TOP

请使用微信扫码支付

订单号:
遇到问题请联系在线客服