A、After loading and discharging, hatch covers will be opened. B、After loading and discharging, hatch covers will be closed. C、Before loading and discharging, hatch covers will be opened. D、Before loading and discharging, hatch covers will be closed.
A、After loading and discharging, hatch covers will be opened. B、After loading and discharging, hatch covers will be closed. C、Before loading and discharging, hatch covers will be opened. D、Before loading and discharging, hatch covers will be closed.
A、Down, Init, 2 - Way, Exstart, Exchange, Loading, and Full B、Down, Init, 2 - Wa y, Exchange, Exstart, Loading, and Full C、Down, 2 - Way, Init, Loading, Exstart, Exchange, and Full D、Down, 2 - Way, Init, Exchange, Exstart, Loading, and Full E、Down, Init, 2 - Way, Loading, Exstart, Exchange, and Full F、Down, 2 - Way, Init, Exstart, Exch ange, Loading, and Full
A、available dunnage,and chocking B、crushability,and inherent vice C、sweat,and weight D、weight,and refrigeration
A、The approved Loading Program could substituted the approved Loading Manual and/or Trim and Stability Booklet B、A Loading Program is required to have General Approval by classification Society prior to being considered for use on a specific ship C、Following a satisfactory installation test on board the ship the Surveyor will issue a Program Installation Test D、A Loading Program may be provided as a classification requirement or as an Owner’s option
A、no earlier than 24 hours prior to loading B、no later than 24 hours prior to loading C、anytime prior to loading D、weekly