搜题
用户您好, 请在下方输入框内搜索其它题目:
搜题
题目内容 (请给出正确答案)
提问人:网友 发布时间:
【单选题】

()the jumbo everything is ready for loading.

A、Except

B、Excepting

C、Except for

D、Except that

更多“()the jumbo everything is ready for loading.”相关的问题
第1题

A、A. The interface configured as FEX fabric requires the MTU to be set to jumbo.  B、B. The service policy must be applied to the system QoS.  C、C. The device defaults to jumbo frame support; no changes are required.  D、D. The switchport in the FEX interface must be set to MTU 9216.  

点击查看答案
第2题

A、anchor windlass  B、jumbo boom  C、rudder  D、steering engine  

点击查看答案
第3题

A、floating crane  B、jumbo boom  C、union purchase  D、crane  

点击查看答案
第4题

A、dismantling and inspecting  B、dismantled and inspected  C、to dismantle and inspect  D、dismantle and inspect  

点击查看答案
第5题

A、all of the parts,dividing the load equally  B、the hauling part because it must absorb the frictional losses of all the sheaves  C、the parts in the movable block  D、the standing part because it is directly connected to the weight  

点击查看答案
第6题

A、heavy cargo derrick  B、heavy deck  C、jumbo boom  D、heavy block  

点击查看答案
第7题

A、A. We dismantle the jumbo boom twice a voyage.  B、B. We dismantle the derricks once a voyage.  C、C. We examine the derricks once a voyage.  D、D. We dismantle the heavy derricks once a voyage.  

点击查看答案
第8题

A、lift heavy cargo  B、load and unload  C、join ropes together  D、lift light cargo  

点击查看答案
第9题

A、A. awkward cargo  B、B. drummed cargo  C、C. cased cargo  D、D. heavy cargo  

点击查看答案
客服
TOP

请使用微信扫码支付

订单号:
遇到问题请联系在线客服