An on-load release system on a survival craft means the cable can be released().
A、only when the load is taken off the cable
B、only when there is a load on the cable
C、only when activated by the controls at the lowering station
D、at any time
A、only when the load is taken off the cable
B、only when there is a load on the cable
C、only when activated by the controls at the lowering station
D、at any time
A、only when the load is taken off the cable B、only when there is a load on the cable C、only when activated by the controls at the lowering station D、at any time
A、only when the load is taken off the cable B、only when there is a load on the cable C、only when activated by the controls at the lowering station D、at any time
A、Servicing agents who are part of the manufacturer’s parent company B、Service agents who are certificated by manufacturer C、Ship’s crew are trained by the manufacturer and authorization statement is available D、Experienced shipyard workers
A、Pull on the hydrostatic release,pull on the sea painter B、Push on the hydrostatic release,pull on the sea painter C、Push on the hydrostatic release,push on the sea painter D、Pull on the hydrostatic release,push on the sea painter
A、The lifeboat is lowered to near the water,loaded with the allowed capacity,lowered into the water until afloat,then released from the falls B、The lifeboat is loaded with the allowed capacity,lowered into the water until afloat,then released from the falls C、The lifeboat is lowered into the water until afloat,loaded with the allowed capacity,then released from the falls D、The lifeboat is lowered to near the water,loaded with the allowed capacity,then released from the falls
A、environmental loading B、variable loading C、fixed loading D、basic loading
A、A change in the load on an interface will cause EIGRP to recalculate the routing metrics and send a corresponding update out to each of its neighbors. B、EIGRP calculates interface load as a 5 - minute exponentially weighted average that is updated every 5 minutes. C、EIGRP considers the load of an interface only when sending an update for some other reason. D、A change in the load on an interface will cause EIGRP to recalculate and update the administrative distance for all routes learne d on that interface.
A、The approved Loading Program could substituted the approved Loading Manual and/or Trim and Stability Booklet B、A Loading Program is required to have General Approval by classification Society prior to being considered for use on a specific ship C、Following a satisfactory installation test on board the ship the Surveyor will issue a Program Installation Test D、A Loading Program may be provided as a classification requirement or as an Owner’s option
A、release CO<sub>2sub> to the protected space B、secure all mechanical ventilation in the protected space C、sound the rig's general alarm signal for a fire D、sound an alarm in the ballast control room