搜题
用户您好, 请在下方输入框内搜索其它题目:
搜题
题目内容 (请给出正确答案)
提问人:网友 发布时间:
【单项选择题】

The operator of each vessel subject to the pollution regulations is NOT required to keep written records of().

A、A.the name of each person designated as a person in charge

B、B.the date and results of the most recent equipment inspection

C、C.cargoes carried and dates delivered,including destinations

D、D.hose information not marked on the hose

更多“The operator of each vessel subject to the pollution regulations is NOT required to keep written records of().”相关的问题
第1题

A、is always effective immediately  B、includes a statement of each condition requiring corrective action  C、must be in writing before it takes effect  D、All of the above  

点击查看答案
第2题

A、is always effective immediately  B、includes a statement of each condition requiring corrective action  C、must be in writing before it takes effect  D、All of the above  

点击查看答案
第3题

A、A.Give each crewmember a copy of ANNEX V of MARPOL  B、B.Call an all hands meeting before sailing  C、C.Keep placards prominently posted  D、D.Have each person read and sign a copy of the regulations  

点击查看答案
第4题

A、In the logbook  B、In the Operations Manual  C、On the Certificate of Inspection  D、On the muster list  

点击查看答案
第5题

A、On the Certificate of Inspection  B、On the station bill  C、In the Operations Manual  D、In either the official or unofficial log  

点击查看答案
第6题

A、eliminates confusion with the final stowage plan  B、shows the approximate amount of cargo to be loaded in each hold  C、expedites the total operation  D、requires an unproportional number of gang hours of work to discharge the cargo  

点击查看答案
第7题

A、start the mechanical ventilation system for the engine room  B、operate the fuel shut-off for the engine room  C、operate all fire extinguishing equipment aboard the vessel on board the vessel,including starting the fire pump  D、All of the above  

点击查看答案
第8题

A、one turn of wire on the first stud from each side of the detachable link  B、two turns of wire on the second stud from each side of the detachable link  C、three turns of wire on the third stud from each side of the detachable link  D、four turns of wire on the fourth stud from each side of the detachable link  

点击查看答案
第9题

A、has much to do with the operation of the engine and its life  B、have much to do with the operation of the engine and its life  C、has much doing with the operation of the engine and its life  D、have much doing with the operation of the engine and its life  

点击查看答案
客服
TOP

请使用微信扫码支付

订单号:
遇到问题请联系在线客服