搜题
用户您好, 请在下方输入框内搜索其它题目:
搜题
题目内容 (请给出正确答案)
提问人:网友 发布时间:
【单选题】

Where must the master or person in charge of a ship record the date of each test of emergency lighting and power systems and the condition and performance of the equipment().

A、On the Certificate of Inspection

B、On the station bill

C、In the Operations Manual

D、In either the official or unofficial log

更多“Where must the master or person in charge of a ship record the date of each test of emergency lighting and power systems and the condition and performance of the equipment().”相关的问题
第1题

A、running rigging leading aft from the masts  B、running rigging leading forward from the masts  C、standing rigging leading aft from the masts  D、standing rigging from the cross trees to the mast head  

点击查看答案
第2题

A、Running rigging leading aft from the masts  B、Running rigging leading forward from the masts  C、Standing rigging leading aft from the masts  D、Standing rigging from the cross trees to the mast head  

点击查看答案
第3题

A、A.running rigging leading aft from the masts  B、B.running rigging leading forward from the masts  C、C.standing rigging leading aft from the masts  D、D.standing rigging from the trees to the mast head  

点击查看答案
第4题

A、one mast  B、two masts: with the mizzen stepped abaft the rudder post  C、two masts: with the mizzen stepped forward of the rudder post  D、two masts: a foremast and a mainmast  

点击查看答案
第5题

A、a single mast  B、two masts: with the mizzen stepped abaft the rudder post  C、two masts: with the mizzen stepped forward of the rudder post  D、at least two masts: a foremast and a mainmast  

点击查看答案
第6题

A、Mast  B、Master  C、Must  D、Main deck  

点击查看答案
第7题

A、A.mast  B、B.master  C、C.must  D、D.derrick  

点击查看答案
第8题

A、he must procure a cargo and bring it alongside the vessel  B、he must load a full and complete cargo  C、he must load in the time stipulated  D、he must have the vessel tightly secured to the quay where the loading is to take place  

点击查看答案
第9题

A、he must procure a cargo and bring it alongside the vessel  B、he must load a full and complete cargo  C、he must load in the time stipulated  D、he must have the vessel tightly secured to the quay where the loading is to take place  

点击查看答案
第10题

A、any wire running fore-and-aft on a ship  B、any wire with a fiber core  C、a heavy wire extending from the trunk of the mast to the head of the boom  D、a heavy wire extending from the mast,atwartships to the deck,to support the mast  

点击查看答案
客服
TOP

请使用微信扫码支付

订单号:
遇到问题请联系在线客服