搜题
用户您好, 请在下方输入框内搜索其它题目:
搜题
题目内容 (请给出正确答案)
提问人:网友 发布时间:
【单选题】

If the ordered spare parts have been modified by manufacturer, which of the following should be pay attention to?()

A、quality

B、reliability

C、price fluctuating

D、applicability

更多“If the ordered spare parts have been modified by manufacturer, which of the following should be pay attention to?()”相关的问题
第1题

A、the manager  B、your agent  C、the PSCO  D、the master  

点击查看答案
第2题

A、A.Spare charges shall be carried for at least 50 percent of each size and variety required on board  B、B.If the unit cannot be charged by the vessel's personnel,one spare unit shall be carried in lieu of spare charges  C、C.Spare charges shall be stowed in watertight containers on deck  D、D.Regulations concerning spare charges do not apply to unmanned barges  

点击查看答案
第3题

A、in the store room  B、in the cylinder  C、in the scavenge air box  D、in the water box  

点击查看答案
第4题

A、repair list  B、spare parts order list  C、price list  D、bunker list  

点击查看答案
第5题

A、The boot order in the BIOS  B、If Plug and Play is enabled  C、If the computer is in Safe Mode  D、If the BIOS is current  

点击查看答案
第6题

A、order list  B、repair list  C、store list  D、spare parts list  

点击查看答案
第7题

A、order list  B、repair list  C、srore list  D、spare parts list  

点击查看答案
第8题

A、The primary line module is inactive for five minutes and then becomes active.  B、The primary line module is in standby mode,while the spare line module remains active.  C、The primary line module becomes active immediately and the spare line module becomes inactive.  D、The primary and spare line modules are active for five minutes,after which time the spare line module becomes inactive.  

点击查看答案
第9题

A、send a requisition list to the supplier  B、check that whether the items ordered have been already delivered  C、make the chief engineer on sport  D、follow a preset procedure  

点击查看答案
客服
TOP

请使用微信扫码支付

订单号:
遇到问题请联系在线客服