When installed for bilge pumping or ballast duty, centrifugal pumps require a () to remove air from the suction pipe.
A、air chamber
B、head lank
C、primer
D、prime mover
A、air chamber
B、head lank
C、primer
D、prime mover
A、A. when installing SSD drives B、B. when adding a new workload C、C. when installing SATA drives D、D. when adding more Linux hosts
A、The administrator improperly configured the virtual memory settings on the server. B、The administrator is using incorrect patch switches for the install. C、The administrator is trying to install security patches for software that is not installed. D、The administrator is trying to install patches that require hard drive encryption on the server.
A、Install the license key and all UTM features will be enabled for the life of the product B、Install one license key per feature and the license key will be enabled for the life of the product. C、Install one UTM license key, which will activate all UTM features; the license will need to be renewed when it expires. D、Install one UTM license key per UTM feature; the licenses will need to be renewed when they expire.
A、It will check the MD5 checksum of the install package. B、It will check if the device meets the memory requirements for the install package. C、It will check the compatibility of the configuration with the install package. D、It will check if the device meets the storage requirement for the install package.
A、Location B、DCPA C、SSID D、Number of client machines
A、Install memory modules in pairs. B、Insure the proper drivers are installed for best performance. C、Apply thermal grease to insure proper seating. D、Wear an anti-static wrist strap.
A、during Installation Cluster Setup, in the CRS Installer B、after installation, during first-time login, in CRS Application Administration C、after installation, in CRS License Update Utility D、during Installation Server Setup, in the CRS Installer
A、When managing more than four VIO servers. B、When installed with Power 570 and larger hardware. C、When hosting both Linux and AIX on the same physical hardware. D、When unexpected outage on a single HMC would prove an untenable risk for the hosted LPARs.
A、Boot/install servers will be required on each intermediate network. B、When an install is initiated by the client, routing is only required from the LPAR back to the NIM master. C、When an install is initiated by the NIM master, routing is only required from the NIM master to the client. D、Appropriate network NIM resources need to be defined to the NIM master to allow routing in both directions.
A、Shutdown the server and boot it into SMS. Select SMS menu option OS Upgrade, Preservation install for the install type, and allow upgrade to run. B、Shut down the server and perform a network boot from a local NIM server. Select Presevation install for the install type, and allow upgrade to run. C、Shutdown the server and boot it into SMS. Select SMS menu option OS Upgrade, Presevation install for the install type, and allow for upgrade to run. D、Re-boot the server and NFS mount the bos images from a local NIM server. Run smit install. Select Presevation install for the install type, and allow upgrade to run.