搜题
用户您好, 请在下方输入框内搜索其它题目:
搜题
题目内容 (请给出正确答案)
提问人:网友 发布时间:
【单选题】

Before loading bulk grain, bilge wells must be covered to().

A、add strength to the bilge well strainer

B、permit rapid flow of water to the bilge wells

C、prevent cargo sifting into the bilge wells

D、preven oil, water , or other liquid from reaching the cargo

更多“Before loading bulk grain, bilge wells must be covered to().”相关的问题
第1题

A、Liquid cargo is loaded and discharged by pumps.  B、Liquid cargo is loaded and discharged by tubes.  C、Liquid bulk cargo is loaded and discharged by tubes.  D、Liquid bulk cargo is loaded and discharged by pumps.  

点击查看答案
第2题

A、maximum sustained vertical load an anchor will resist before dragging  B、maximum sustained horizontal load an anchor will resist before dragging  C、maximum sustained vertical load an anchor will resist before the mooring line breaks  D、maximum sustained horizontal load an anchor will resist before the mooring line breaks  

点击查看答案
第3题

A、loading  B、load  C、loaded  D、loads  

点击查看答案
第4题

A、After loading and discharging, hatch covers will be opened.  B、After loading and discharging, hatch covers will be closed.  C、Before loading and discharging, hatch covers will be opened.  D、Before loading and discharging, hatch covers will be closed.  

点击查看答案
第5题

A、before the gripes are removed  B、before loading the passengers  C、after loading the passengers  D、after the boat is afloat  

点击查看答案
第6题

A、Create both jobs by using events raised by the scheduler  B、Create both jobs by using events raised by the application  C、Create a job to rebuild indexes by using events arised by the application and then create another job to perform bulk load by using events raised by the scheduler  D、Create a job to rebuild indexes by using events arised by the Scheduller and then create another job to perform bulk load by using events raised by the application  

点击查看答案
第7题

A、Create both jobs by using events raised by the scheduler  B、Create both jobs by using events raised by the application  C、Create a job to rebuild indexes by using events arised by the application and then create another job to perform bulk load by using events raised by the scheduler  D、Create a job to rebuild indexes by using events arised by the Scheduler and then create another job to perform bulk load by using events raised by the application  

点击查看答案
第8题

A、A.add strength to the bilge well strainer  B、B.permit rapid flow of water to the bilge wells  C、C.prevent cargo sifting into the bilge wells  D、D.prevent oil,water,or other liquid from reaching the cargo  

点击查看答案
第9题

A、A.survey planning document  B、B.muster lists  C、C.bulk carrier booklet  D、D.bulk carrier loading triangle  

点击查看答案
客服
TOP

请使用微信扫码支付

订单号:
遇到问题请联系在线客服