搜题
用户您好, 请在下方输入框内搜索其它题目:
搜题
题目内容 (请给出正确答案)
提问人:网友 发布时间:
【单项选择题】

A lashing used to secure two barges side by side,lashed in an "X" fashion,is called a ().

A、A.scissor wire

B、B.towing wire

C、C.breast wire

D、D.cross wire

更多“A lashing used to secure two barges side by side,lashed in an "X" fashion,is called a ().”相关的问题
第1题

A、Stack weights should be less when using a solid bar lashing as compared to a wire lashing  B、Stack heights may be increased when using a solid bar lashing  C、Stack heights should be reduced when using a solid bar lashing  D、Solid bars should be used for lashing the first tier only,with wire lashings on the higher tier(s)  

点击查看答案
第2题

A、Lashing bars, twist locks, bridge plates and bridge fittings are tools used for lashing containers.  B、Twist locks, bridge plates, bridge fittings and lashing bars are tools used for lashing containers.  C、Twist locks, lashing bars, bridge fittings and bridge plates are tools used for lashing containers.  D、Lashing bars, bridge fittings, bridge plates and twist locks are tools used for lashing containers.  

点击查看答案
第3题

A、Turnbuckles  B、Lashing bars  C、Twist locks  D、Lashing wires  

点击查看答案
第4题

AA. Turnbuckles  B、B. Lashing bars  C、C. Twist locks  D、D. Lashing wires  

点击查看答案
第6题

A、backing wire  B、scissor wire  C、face wire  D、breast wire  

点击查看答案
第7题

AA.quarter line  B、B.back line  C、C.peg line  D、D.jockey line  

点击查看答案
第8题

A、Periodic inspection and retensioning of lashings as required during voyage  B、Lashings may be completed after the vessel leaves port  C、One QMED assigned to oversee the initial loading and lashing  D、All of the above  

点击查看答案
第9题

A、Different lashing tools should be used separately.  B、Different lashing tools should be stowed separately.  C、Different lashing wires should be stowed separately.  D、Different lashing bars should be stowed separately.  

点击查看答案
客服
TOP

请使用微信扫码支付

订单号:
遇到问题请联系在线客服