搜题
用户您好, 请在下方输入框内搜索其它题目:
搜题
题目内容 (请给出正确答案)
提问人:网友 发布时间:
【单选题】

A company uses Routers R1 and R2 to connect to ISP1 and ISP2, respectively, with Routers I1 and I2 used at the ISPs. R1 peers with I1 and R2; R2 peers with I2 and R1.<br /> Assuming as many default s ettings as possible are used on all four routers, which of the following is true about the next - hop IP address for routes R1 learns over its iBGP connection to R2?()

A、The next hop is I2's BGP RID

B、The next hop is I2's IP address used on the R2 - I2 neigh bor relationship

C、The next hop is R2's BGP RID

D、The next hop is R2's IP address used on the R1 - R2 neighbor relationship

更多“ A company uses Routers R1 and R2 to connect to ISP1 and ISP2, respectively, with Routers I1 and I2 used at the ISPs. R1 peers with I1 and R2; R2 peers with I2 and R1.<br /> Assuming as many default s ettings as possible are used on all four routers, which of the following is true about the next - hop IP address for routes R1 learns over its iBGP connection to R2?()”相关的问题
第9题

A、Convert all the routers to EIGRP and use 198.133.219.32/27, 198.133.219.64/27, and 198.133.219.92/27 as the new subnetworks.  B、Maintain the use of RIP version 1 and use 198.133.219.32/27, 198.133.219.64/27, and 133.219.92/27 as the new subnetworks.  C、Convert all the routers to EIGRP and use 198.133.219.64/26, 198.133.219.128/26, and 133.219.192/26 as the new subnetworks.  D、Convert all the routers to RIP version 2 and use 198.133.219.64/26, 198.133.219.128/26, and 133.219.192/26 as the new subnetworks.  E、Convert all the routers to OSPF and use 198.133.219.16/28, 198.133.219.32/28, and 198.133.219.48/28 as the new subnetworks.  F、Convert all the routers to static routes and use 198.133.219.16/28, 198.133.219.32/28, and  

点击查看答案
第10题

A、You should consider having the Exchange Management Console (EMC) tool used.  B、You should consider having Microsoft Office Outlook tool used.  C、You should consider having Active Directory Users and Computers tool used.  D、You should consider having the Exchange Control Panel (ECP) tool used.  

点击查看答案
客服
TOP

请使用微信扫码支付

订单号:
遇到问题请联系在线客服