搜题
用户您好, 请在下方输入框内搜索其它题目:
搜题
题目内容 (请给出正确答案)
提问人:网友 发布时间:
【单选题】

SONET Code Violations (CVs) totals in the PM tables are actually an accumulation of the number of ().

A、J0 errors detected in a specified interval

B、errors detected in a given Errored Second (ES)

C、errors detected in a given Severely Errored Second (SES)

D、errors the encryption algorithm detects in a specified interval

E、Bit Interleaved Parity (BIP) errors detected in a specified interval

更多“SONET Code Violations (CVs) totals in the PM tables are actually an accumulation of the number of ().”相关的问题
第1题

A、SDH circuit over a SONET network delivering it as an SDH signal  B、SDH circuit over a SONET network delivering it as a SONET signal  C、SONET circuit over an SDH network delivering it as an SDH signal  D、SONET circuit over an SDH network delivering it as a SONET signal  

点击查看答案
第2题

A、the K1 SONET byte; the K2 SONET byte  B、the K2 SONET byte;the K1 SONET byte  C、transmitter switching;receiver detection  D、Line Overhead bytes;Path Overhead bytes  E、Path Overhead bytes;Line Overhead bytes  

点击查看答案
第4题

A、 SDH circuit over a SONET network delivering it as an SDH signal  B、 SDH circuit over a SONET network delivering it as a SONET signal  C、 SONET circuit over an SDH network delivering it as an SDH signal  D、 SONET circuit over an SDH network delivering it as a SONET signal  

点击查看答案
第7题

A、10G光模块,可用在万兆以太网,多采用LC接口  B、10G光模块,可用在SONET系统,多采用FC接口  C、10G光模块,应用在万兆以太网,采用SC接口  D、10G光模块,可用在SONET系统,用ST接口  

点击查看答案
第9题

A、DUS  B、line timing  C、loop timing  D、internal timing  E、through timing  

点击查看答案
第10题

A、constitutes a violation of the Act  B、obligates the operator to moor or anchor the vessel immediately  C、requires immediate,emergency repairs  D、does not,in itself,constitute a violation of the Act  

点击查看答案
客服
TOP

请使用微信扫码支付

订单号:
遇到问题请联系在线客服