搜题
用户您好, 请在下方输入框内搜索其它题目:
搜题
题目内容 (请给出正确答案)
提问人:网友 发布时间:
【单选题】

In a combination chain and wire rope mooring system,the anchor chain is deployed at the anchor end of the line to().

A、increase fatigue life of the system

B、reduce the time to retrieve the line

C、increase the holding power

D、reduce the catenary

更多“In a combination chain and wire rope mooring system,the anchor chain is deployed at the anchor end of the line to().”相关的问题
第1题

AIn interface configuration mode, the OSPFv3 area ID combination assigns interfaces to OSPFv3 areas.  B、In router configuration mode, the network wildcard area ID combination assigns networks to OSPFv3 areas.  C、In interface configuration mode, the IPv6 OSPF process area ID combination assigns interfaces to OSPFv3 areas.  D、In router configuration mode, the IPv6 OSPF interface area ID combination assigns interfaces to OSPFv3 areas.  

点击查看答案
第3题

A、Combined、Flight液压泵  B、Combined、辅助液压泵  C、Combined、Flight、Utility液压泵  D、Combined、Utility液压泵  

点击查看答案
第5题

A、lower the no-load RPMs  B、provide more air for combine with the fuel  C、increase the no-load RPMs  D、provide more fuel combine with the air  

点击查看答案
第6题

A、Combined、Flight、辅助系统  B、Combined、Flight、Utility  C、Combined、Flight、Utility、辅助系统  D、Combined、Flight  

点击查看答案
第7题

A、being rigged combined  B、is rigged combining  C、rigs combining  D、is rigged combined  

点击查看答案
第8题

Ain  B、on  C、at  D、with  

点击查看答案
第10题

AA.being rigged combined  B、B.is rigged combining  C、C.rigs combining  D、D.is rigged combined  

点击查看答案
客服
TOP

请使用微信扫码支付

订单号:
遇到问题请联系在线客服