搜题
用户您好, 请在下方输入框内搜索其它题目:
搜题
题目内容 (请给出正确答案)
提问人:网友 发布时间:
【单选题】

Get ready the mooring machinery, mooring lines and the gangway for ().

A、loading cargo

B、arrival in port

C、departure from port

D、unloading cargo

更多“Get ready the mooring machinery, mooring lines and the gangway for ().”相关的问题
第1题

A、Get anchor ready and ring “Stand by engine”.  B、Get anchor ready and ring “Finished with engine”.  C、Get mooring ready and ring “Stand by engine”.  D、Get mooring ready and ring “Finished with engine”.  

点击查看答案
第2题

A、Get ready for the ropes.  B、Keep away from the ropes.  C、Slack away the ropes.  D、Heave in the rope.  

点击查看答案
第3题

A、Stand at the gangway  B、Wait at the gangway  C、Get the gangway ready  D、Keep on the gangway  

点击查看答案
第4题

A、A. Other parties keep a close watch on the fire.  B、B. Other parties watch on the fire.  C、C. Other parties get ready for leaving the boat and boarding the ship.  D、D. Other parties got ready for leaving the boat and boarding the ship.  

点击查看答案
第5题

A、turned off  B、already  C、almost  D、ready  

点击查看答案
第6题

A、turned off  B、already  C、almost  D、ready  

点击查看答案
第7题

A、to get the engine ready  B、to respond to the engine  C、to maneuver the engine  D、to change the engine  

点击查看答案
第8题

A、Get ready for lowering the boat.  B、The muster station is usually on the boat deck.  C、The cable is leading straight ahead.  D、Hoist the anchor ball.  

点击查看答案
第9题

A、Get the engine ready.  B、Ring off engine.  C、Stop engine.  D、Stand on it.  

点击查看答案
客服
TOP

请使用微信扫码支付

订单号:
遇到问题请联系在线客服