搜题
用户您好, 请在下方输入框内搜索其它题目:
搜题
题目内容 (请给出正确答案)
提问人:网友 发布时间:
【单选题】

Progressive flooding is controlled by securing watertight boundaries and().

A、transferring water ballast

B、jettisoning cargo

C、pumping out flooded compartments

D、abandoning ship

更多“Progressive flooding is controlled by securing watertight boundaries and().”相关的问题
第1题

A、transferring drill water  B、dumping bulk materials  C、pumping out flooded compartments  D、evacuating the unit  

点击查看答案
第2题

A、negative GM  B、progressive flooding  C、structural failure  D、an immediate need to ballast  

点击查看答案
第3题

A、ballast control alarms  B、excessive draft  C、excessive list or trim  D、a continual worsening of list or trim  

点击查看答案
第4题

A、ballast control alarms  B、excessive draft  C、excessive list or trim  D、a continual worsening of list or trim  

点击查看答案
第5题

A、free surface effects  B、capsizing  C、continued progressive flooding  D、wind heel  

点击查看答案
第6题

A、negative GM  B、progressive flooding  C、structural failure  D、an immediate need to counterflood  

点击查看答案
第7题

A、A.negative GM  B、B.progressive flooding  C、C.structural failure  D、D.an immediate need to ballast  

点击查看答案
第8题

A、negative GM  B、progressive flooding  C、structural failure  D、an immediate need to counterflood  

点击查看答案
第9题

A、availability of tools  B、shape of the hull  C、pressure exerted by the water  D、threat of progressive flooding  

点击查看答案
客服
TOP

请使用微信扫码支付

订单号:
遇到问题请联系在线客服