The officer in charge of the engineering watch shall ensure that at all times bridge orders relating to changes in () of operation are immediately implemented.
A、A.ahead or astern
B、B.fore or aft
C、C.up or down
D、D.speed or direction
A、A.ahead or astern
B、B.fore or aft
C、C.up or down
D、D.speed or direction
A、the engineer officer in charge of watch B、the deck officer in charge of watch C、the master D、the chief mate
A、Chief Officer B、Navigator C、most senior person present from the Maritime Administration D、officer in charge of the watch
A、the depth of the water at the berth B、the ship‟s draught C、the duty of the relieving officer D、the arrangement of anchor and the scope of the anchor chain
A、a marine chemist B、the Officer in Charge,Marine Inspection C、the Master or person in charge of the ship D、the National Fire Protection Association
A、a marine chemist B、the Officer in Charge,Marine Inspection C、the Master or person in charge of the ship D、the National Fire Protection Association
A、to ensure the main propulsion plant are kept under constant surveillance B、to ensure the auxiliary systems are kept under constant surveillance C、to inspect the steering gear spaces at suitable intervals D、to inspect and overhaul the equipments in his charge
A、in any emergency or if in any doubt as to what decision or measures to take B、in the event of any impending action in machinery spaces that may cause reduction in ship’s speed C、when isolating and bypassing machinery to be worked on D、co-operating with any engineer in charge of maintenance work
A、hull cleaning B、derusting and painting C、the maintenance of boiler D、docking and undocking