搜题
用户您好, 请在下方输入框内搜索其它题目:
搜题
题目内容 (请给出正确答案)
提问人:网友 发布时间:
【单选题】

Following an unscheduled power outage, theadministrator needs to power up an IVM-managed system.<br /> For the given system,what is the first step in this process?()

A、Physically press the appropriate button on the system.

B、Physically disconnect and reconnect the power cable on the system.

C、Log into the IVM using a Web Browser, select the managed-system and select the Power on option from the Operations menu.

D、Log into the HMC using a Web Browser, select the managed-system and select the Power on option from the Operations menu.

更多“ Following an unscheduled power outage, theadministrator needs to power up an IVM-managed system.<br /> For the given system,what is the first step in this process?()”相关的问题
第4题

A、P5板上STAB TRIM灯亮  B、P5板上UNSCHED STAB TRIM灯亮  C、EICAS上发出M级信息  D、EICAS上发出A级WARNING信息  

点击查看答案
第7题

A、P5板上STAB TRIM灯亮  B、P5板上UNSCHED STAB TRIM灯亮  C、EICAS上发出M级信息  D、EICAS上发出A级WARNING信息  

点击查看答案
第10题

A、A. ARP spoofing  B、B. VLAN  C、C. Mirroring  D、D. Spanning tree  

点击查看答案
客服
TOP

请使用微信扫码支付

订单号:
遇到问题请联系在线客服