Which action(s)should the operator of a pedestal crane take if crane control is lost ().
A、Let go of both control levers and return to neutral position
B、Press the emergency stop
C、Notify the mate on watch
D、All of the above
A、Let go of both control levers and return to neutral position
B、Press the emergency stop
C、Notify the mate on watch
D、All of the above
A、Log packets. B、Set packet metrics. C、Count packets. D、Decrement packet's TTL value.
A、Rudder action will become more effective B、The vessel's list will change C、The vessel's trim will change D、An increase in speed will occur
A、Normal boom stowage and shutdown operations B、Emergency shutdown operation C、Removing booms from stowage D、All of the above
A、Normal boom stowage and shutdown operations B、Emergency shutdown operation C、Removing booms from stowage D、All of the above
A、 form action  B、 view action  C、 hotspot action  D、 db action
A、A.174.24.96:6088/Latex/latex.action?latex=XHBoaSBeXG9taW51cyA9LTAuMjVW'
B.174.24.96:6088/Latex/latex.action?latex=XHBoaSBeXG9taW51cw%3D%3D'
C.174.24.96:6088/Latex/latex.action?latex=XHBoaSBeXG9taW51cw%3D%3D'
A、reject B、community add C、next term D、next policy
A、A. Multiple action modifiers can be included in the same term. B、B. Only a single action modifier can be included in the same term. C、C. If an action modifier exists without a terminating action, matching packets will be accepted. D、D. If an action modifier exists without a terminating action, matching packets will be discarded.
A、FIELD Type :="action"      B、SELECT Type ="action"  C、SELECT Type :="action "       D、@if (type="action";@success;@failure) 
A、Runlevel:Action:Identifier:Command B、Identifier:Runlevel:Action:Command C、Command:Action:Identifier:Process D、Process:Runlevel:Command:Identifier