搜题
用户您好, 请在下方输入框内搜索其它题目:
搜题
题目内容 (请给出正确答案)
提问人:网友 发布时间:
【单选题】

The shear rams of a ship blowout preventer stack are used in emergency well control to().

A、close and seal around the drill pipe

B、close and seal around casing

C、cut off pipe inside the preventer stack

D、close and seal around drill collars

更多“The shear rams of a ship blowout preventer stack are used in emergency well control to().”相关的问题
第2题

AThe newly installed RAM has a lower clock speed than the existing RAM.  B、The CPU is not configured to work with the additional RAM.  C、The system is incompatible with the new RAM.  D、The new RAM is of lower quality, and not dependable at higher speeds.  

点击查看答案
第3题

A、50 MB of available disk space and 128 MB of RAM  B、100 MB of available disk space and 256 MB of RAM  C、200 MB of available disk space and 512 MB of RAM  D、300 MB of available disk space and 512 MB of RAM  

点击查看答案
第4题

A、bending stresses弯曲应力  B、torsion stresses扭转应力  C、shear stresses剪应力  D、All of the above  

点击查看答案
第6题

A、hogging stresses  B、sagging stresses  C、racking stresses  D、shearing stresses  

点击查看答案
第7题

AThe rams work inside cylinders  B、The cylinders have glands sealing their open ends  C、The rams are connected to a cross-head  D、The cross-head is mounted on the rudder stock  

点击查看答案
第8题

A、Install heatsinks on the RAM modules.  B、Install additional CPU fans.  C、Replace the RAM slots.  D、Install a heatsink on the chipset driver  

点击查看答案
第9题

AA.The rams work inside cylinders  B、B.The cylinders have glands sealing their open ends  C、C.The rams are connected to a cross-head  D、D.The cross-head is mounted on the rudder stock  

点击查看答案
客服
TOP

请使用微信扫码支付

订单号:
遇到问题请联系在线客服