Is extra power available()emergency while maneuvering?
A、for
B、in
C、during
D、to
A、for
B、in
C、during
D、to
A、A.Redundant system clock B、B.Redundant service processor C、C.POWER7 cores include redundant L3 caches D、D.Main memory DIMMs contain an extra DRAM chip for improved redundancy
A、Space for antennas B、Frequency allocation C、Electrical power availability D、Contract with owner E、Availability of transmission to the BSC
A、Continue plugging into the central UPS, but put the UPS on bypass to avoid load problems. B、Plug the servers directly into the power that is not on the UPS. C、Add stand alone UPSs for new servers not wired off the central UPS. D、Continue plugging into the central UPS because the actual load supported is actually higher than stated
A、Install the exhaust fan on top of the IBM NetBAY 42 Enterprise rack for extra cooling B、Ensure a 260V power source for the x445 and BladeCenter is available for fully redundant power C、Ensure a 220v power source for the x445 is available for fully redundant power D、Install the new 10GBit Ethernet network to take advantage of the new network switch in the x445. E、Have their Network Operation Staff review and assist connecting the new server to their existing network.