搜题
用户您好, 请在下方输入框内搜索其它题目:
搜题
题目内容 (请给出正确答案)
提问人:网友 发布时间:
【单选题】

When preparing a ship for heavy weather,fuel oil day tanks should be().

A、pumped overboard to calm the seas

B、drained to the lower hull to reduce free surfaces

C、filled to ensure that sufficient fuel oil is available during a lengthy emergency

D、partially drained to increase free surfaces in order to reduce motions

更多“When preparing a ship for heavy weather,fuel oil day tanks should be().”相关的问题
第2题

Apreparing  B、prepare  C、prepared  D、prepares  

点击查看答案
第3题

AA.prepares  B、B.preparing  C、C.prepared  D、D.prepare  

点击查看答案
第4题

A、Prepare to abandon ship.  B、Prepare for abandon ship.  C、Prepare abandon ship.  D、Prepare for ship.  

点击查看答案
第5题

AA.prepares  B、B.preparing  C、C.prepared  D、D.prepare  

点击查看答案
第6题

AWhena file is created in DGROUP1 with the template, it would have three­way mirroring.   B、Whena file is created in DGROUP1, the MY_TEMP template becomes the default template.  C、Whena file is created in DGROUP1 with the template, it would have two­way mirroring and file striping.  D、Whena file is created in DGROUP1 with the template, it would have three­way mirroring and file striping.  E、Whena file is created in DGROUP1 with the template, it would have two­way mirroring but no file striping.  

点击查看答案
第7题

AA.engaged to  B、B.engaged for  C、C.engaged on  D、D.engaged in  

点击查看答案
第8题

A、发件箱中有kao@sina.com的邮件  B、发件箱中有shi@sina.com的邮件  C、已发送箱中有kao@sina.com的邮件  D、已发送箱中有shi@sina.com的邮件  

点击查看答案
客服
TOP

请使用微信扫码支付

订单号:
遇到问题请联系在线客服