搜题
用户您好, 请在下方输入框内搜索其它题目:
搜题
题目内容 (请给出正确答案)
提问人:网友 发布时间:
【单选题】

A deck above the main deck at the bow is the ()(首楼) deck.

A、bow

B、forecastle

C、stern

D、poop

更多“A deck above the main deck at the bow is the ()(首楼) deck.”相关的问题
第1题

A、lower most continuous deck not broken by water tight bulkheads  B、after most weather deck above the main strength deck  C、upper or weather deck above the main strength deck  D、deck of light construction below the main or strength deck  

点击查看答案
第2题

A、lower most continuous deck not broken by water tight bulkheads  B、after most weather deck above the main strength deck  C、upper or weather deck above the main strength deck  D、deck of light construction below the main or strength deck  

点击查看答案
第3题

A、lower most continuous deck not broken by water tight bulkheads  B、after most weather deck above the main strength deck  C、upper or weather deck above the main strength deck  D、deck of light construction below the main or strength deck  

点击查看答案
第4题

AThe deck below the lower deck is known as ‘tween deck.  B、The deck below the main deck is known as ‘tween deck.  C、The deck above the main deck is known as ‘tween deck.  D、The deck below the lower deck is known as main deck.  

点击查看答案
第5题

A、fore deck  B、fore quarter  C、aft quarter  D、forecastle deck  

点击查看答案
第6题

Aany deck below the main deck and above the lowest deck  B、a member that gives fore-and-strength  C、made by placing two bulkhead a few feet apart  D、a heavy fore-and-aft beam under the deck  

点击查看答案
第7题

Aany deck below the main deck and above the lowest deck  B、a member that gives fore-and-aft strength  C、made by placing two bulkheads a few feet apart  D、a heavy fore-and-aft beam under the deck  

点击查看答案
第8题

A、increase their strength  B、provide drainage from the decks  C、relieve deck stress  D、All of the above  

点击查看答案
第9题

AA.increase their strength  B、B.provide drainage from the decks  C、C.relieve deck stress  D、D.All of the above  

点击查看答案
客服
TOP

请使用微信扫码支付

订单号:
遇到问题请联系在线客服