搜题
用户您好, 请在下方输入框内搜索其它题目:
搜题
题目内容 (请给出正确答案)
提问人:网友 发布时间:
【多项选择题】

Which two events will cause a slave server to create a new relay log file?()

A、A.Execution of the FLUSH LOGS statement

B、B.Starting of the SQL thread

C、C.Reaching the slave_pendign _jobs_size_max limit

D、D.Execution of FULSH TABLES WITH READ LOCK

E、E.Starting of the I/O thread

更多“Which two events will cause a slave server to create a new relay log file?()”相关的问题
第1题

A、A.Using DELETE statements, for example, DELETE FROM performance_schema.events_watis_current  B、B.Using the statement RESET PERFORMANCE CACHE  C、C.Using the statement FLUSH PERFORMANCE CACHE  D、D.Using TRUNCATE statements, for example, TRUNATE TABLE performance_schema.events_waits_current  E、E.Disabling and re-enabling all instruments  F、F.Restarting Mysql  

点击查看答案
第3题

A、Exhaust and scavenging  B、Scavenging and compression  C、Ignition and expansion  D、Exhaust and compression  

点击查看答案
第7题

A、A job chain can contain a nested chain of jobs.  B、The jobs in a job chain cannot have more than one dependency.  C、A job of the CHAIN type can be run using event-based or time-based schedules.  D、The jobs in a job chain can be executed only by using the events generated by the Scheduler  

点击查看答案
客服
TOP

请使用微信扫码支付

订单号:
遇到问题请联系在线客服