搜题
用户您好, 请在下方输入框内搜索其它题目:
搜题
题目内容 (请给出正确答案)
提问人:网友 发布时间:
【单选题】

In ship operations,hoisting and lowering pipe in and out of the drilled hole is the main function of the().

A、swivel

B、cathead spool

C、drawworks

D、stand pipe

更多“In ship operations,hoisting and lowering pipe in and out of the drilled hole is the main function of the().”相关的问题
第2题

A、A.SAR party and the ship in distress  B、B.SAR authorities and the ship in distress and survival craft  C、C.A ship station and any coast station  D、D.Ship stations and shore-based communication network  

点击查看答案
第4题

A、reach the distress area  B、conduct a sector search  C、send rescue vessels  D、assist coordinately in SAR operation  

点击查看答案
第5题

A、Ship owner‟s will  B、economic condition  C、the area in which the ship operates  D、different orders of all countries  

点击查看答案
第7题

A、AIS may be used to make passing arrangements via ship-to-ship text messaging thus relieving a vessel operator from sounding whistle signals or making contact via radiotelephone  B、AIS may be used to make passing arrangements via ship-to-ship text messaging but a vessel operator is still required to sound whistle signals unless the arrangement is made via radiotelephone  C、AIS cannot be used to make passing arrangements because the system does not have the ability to communicate from ship-to-ship in this manner  D、AIS cannot be used to make passing arrangements because the use of the ship-to-ship text messaging feature in this way is prohibited  

点击查看答案
客服
TOP

请使用微信扫码支付

订单号:
遇到问题请联系在线客服