搜题
用户您好, 请在下方输入框内搜索其它题目:
搜题
题目内容 (请给出正确答案)
提问人:网友 发布时间:
【单选题】

()means a plan developed to ensure the application of measures on board the ship designed to protect persons on board, cargo, cargo transport units, ship’s stores or the ship from the risks of a security incident.

A、Ship security plan

B、Company security plan

C、Port facility security plan

D、National security plan

更多“()means a plan developed to ensure the application of measures on board the ship designed to protect persons on board, cargo, cargo transport units, ship’s stores or the ship from the risks of a security incident.”相关的问题
第2题

AA.mean pilot channel output power-mean data channel output power  B、B.mean pilot channel output power+mean data channel output power  C、C.mean pilot channel output power-0.5*mean data channel output power  D、D.mean pilot channel output power+0.5*mean data channel output power  

点击查看答案
第3题

A、It means summer draft  B、It means Maximum draft  C、It means Fresh Water draft  D、It means Seawater Draft  

点击查看答案
第4题

A、It means summer draft  B、It means maximum draft  C、It means fresh water draft  D、It means seawater draft  

点击查看答案
第5题

A、by all means  B、by means of  C、by no means  D、by means for  

点击查看答案
第6题

A、by all means  B、by no means  C、by any means  D、by means of  

点击查看答案
第7题

A、mean low water  B、mean lower low water  C、mean high water  D、mean high water springs  

点击查看答案
第8题

A、BAY PLAN、DAILY REPORT、GENERAL STOWAGE PLAN  B、BAY PLAN、SUMMARY LIST、GENERAL STOWAGE PLAN  C、BLANK PLAN、SUMMARY LIST、GENERAL STOWAGE PLAN  

点击查看答案
第9题

A、The optimizer adds the new plan to the plan history.  B、The optimizer selects the new plan for the execution of the SQL statement.  C、The optimizer adds the new plan to the SQL plan baseline as an accepted plan.  D、The optimizer adds the new plan to the SQL plan baseline but not in the ENABLED state.  E、The optimizer costs each of the accepted plans in the SQL plan baseline and picks the one with the lowest cost.  

点击查看答案
客服
TOP

请使用微信扫码支付

订单号:
遇到问题请联系在线客服