搜题
用户您好, 请在下方输入框内搜索其它题目:
搜题
题目内容 (请给出正确答案)
提问人:网友 发布时间:
【单选题】

Mooring()are placed on both banks of the Suez Canal about 200m apart.

A、bollards

B、ballasts

C、bands

D、benefits

更多“Mooring()are placed on both banks of the Suez Canal about 200m apart.”相关的问题
第1题

A、bollards  B、ballasts  C、bands  D、benefits  

点击查看答案
第2题

A、the eye of the second line is dipped  B、the mooring lines are doubled  C、the bollard has two horns  D、one of the lines is a breast line  

点击查看答案
第3题

A、Place the eye from the forward line on the bollard and then place the eye from the second line directly over the first  B、It makes no difference how the lines are placed  C、Place the eye from either line on the bollard,and then bring the eye of the other line up through the eye of the first,and place it on the bollard  D、Place both eyes on the bollard,in any manner,but lead both lines to the same winch head on the vessel and secure them on the winch  

点击查看答案
第4题

A、excessive loads are placed on the winch  B、minimum pull is being exerted by the winch  C、automatic operation of the winch is desired  D、wire is being retrieved at the maximum rate  

点击查看答案
第5题

A、Put one line at the low point and one at the high point of the bollard so they don't touch  B、Take the eye of the second line up through the eye of the first line before putting the second line on the bollard  C、Never put two mooring lines on the same bollard  D、The mooring line forward should be put on the bollard first  

点击查看答案
第6题

A、Cranes  B、Mooring winches  C、Windlasses  D、Foreman  

点击查看答案
第7题

A、at all wearing points of mooring lines  B、at the bitter ends of all standing rigging  C、around running rigging  D、on wire rope only  

点击查看答案
第8题

A、Cargo winches  B、Mooring winches  C、Windlasses  D、Cargo hatches  

点击查看答案
第9题

A、Adjust the mooring lines on time.  B、Adjust the mooring lines in time.  C、Adjust the mooring lines quickly.  D、Adjust the mooring lines slowly.  

点击查看答案
客服
TOP

请使用微信扫码支付

订单号:
遇到问题请联系在线客服