When one of the original bills of lading being surrendered to the carrier, the others become ().
A、A.invalid
B、B.valid
C、C.clean
D、D.dirty
A、A.invalid
B、B.valid
C、C.clean
D、D.dirty
A、one meter from the tank bottom and one meter below the tank top B、one half the ullage of the tank and one meter below the tank top C、one half the ullage of the tank and one meter above the tank bottom D、at three meter intervals from the tank top to the bottom
A、one meter from the tank bottom and one meter below the tank top B、one half the ullage of the tank and one meter below the tank top C、one half the ullage of the tank and one meter above the tank bottom D、at three meter intervals from the tank top
A、one meter from the tank bottom and one meter below the tank top B、one half the ullage of the tank and one meter below the tank top C、one half the ullage of the tank and one meter above the tank bottom D、at three meter intervals from the tank top
A、In sight of another B、Sights the another C、Not in sight of the other D、In sight of one another
A、about one-quarter of the vessel's length from the stern B、at the bow C、about one-third of the vessel's length from the bow D、aft of the propellers
A、Add one hour to the times listed under the reference stations B、Subtract one hour from the time differences listed for the subordinate stations C、Apply no correction as the times in the reference stations are adjusted for daylight savings time D、Add 15° to the standard meridian when calculating the time difference
A、A.when one of the tunnel peers has a dynamic IP address B、B.when one of the tunnel peers wants to force main mode to be used C、C.when fragmentation of the IKE packet is required between the two peers D、D.when one of the tunnel peers wants to specify a different phase 1 proposal
A、Any time the vessel moves from water of one density into waters of a different density B、Prior to getting underway when the vessel is floating in fresh or brackish water C、Only when the vessel moves from fresh water into salt water D、The density of the water is not required to be logged in the unofficial logbook
A、use the magnets one at a time,putting one in one side and then one on the opposite side,one step higher B、use the magnets in pairs,starting at the top,with trays at the highest point of travel C、use the magnets in pairs,from the bottom up,with the trays at the lowest point of travel D、fill all the trays with magnets,then remove them one-by-one until the deviation is removed
A、Install the license key and all UTM features will be enabled for the life of the product B、Install one license key per feature and the license key will be enabled for the life of the product. C、Install one UTM license key, which will activate all UTM features; the license will need to be renewed when it expires. D、Install one UTM license key per UTM feature; the licenses will need to be renewed when they expire.