The space in No.1 lower hold is nearly full up but there is still some()side.
A、A.cabin
B、B.cabins
C、C.room
D、D.rooms
A、A.cabin
B、B.cabins
C、C.room
D、D.rooms
A、A. Change the RMAN archived log deletion policy B、B. Use the RMAN CROSSCHECK command to reclaim the archived log space C、C. Change the RMAN retention policy to retain backups for a shorter period of time D、D. Use OS command to move files from the flash recovery area to some other location
A、Use either 1 or 2 tiers of dunnage,spacing the pieces in each tier a foot apart,and lay pieces in the bottom tier diagonally to the ship's side B、Use 1 tier of dunnage,laying the pieces tightly together to form a solid floor over the steel deck C、Use 2 tiers of dunnage,spacing the pieces in the bottom tier about a foot apart and the pieces in the top tier 6 inches apart D、Use 2 tiers of dunnage,spacing the pieces in the bottom tier about a foot apart and the pieces in the top tier together
A、ventilate all compartments,see that the machinery is clean and there are no obstructions B、just turn the key and start up C、take for granted that there are no fuel leaks D、assume there are no volatile fumes in the engine space
A、Master,or person in charge B、Chief Engineer,or engineer in charge if no chief engineer is required C、Senior mechanic,or mechanic on duty if no senior mechanic designated D、Senior electrician,or electrician on duty if no senior electrician designated
A、is properly vented B、contains no explosive fumes C、has no oil in the bilges D、all of the above
A、No size is specified B、The buffer pool size C、The page size for the table space D、The extent size for the table space
A、A.cooling water of the cooling system B、B.fuel of the FO system C、C.LO of the LO system D、D.cooling water of the cooling system and LO of the LO system