搜题
用户您好, 请在下方输入框内搜索其它题目:
搜题
题目内容 (请给出正确答案)
提问人:网友 发布时间:
【单选题】

When loading bulk liquid cargo,what is the FIRST action you should take if a cargo valve jammed open?()

A、Trip the pump relief valve

B、Order the dock man to shut down

C、Call the owner,operator,or terminal supervisor

D、Run out the vessel's or terminal's fire hose

更多“When loading bulk liquid cargo,what is the FIRST action you should take if a cargo valve jammed open?()”相关的问题
第1题

A、Liquid cargo is loaded and discharged by pumps.  B、Liquid cargo is loaded and discharged by tubes.  C、Liquid bulk cargo is loaded and discharged by tubes.  D、Liquid bulk cargo is loaded and discharged by pumps.  

点击查看答案
第2题

A、A.when can the stevedores finish loading  B、B.when will the stevedores finish loading  C、C.when the stevedores can finish loading  D、D.when the stevedores finish loading can  

点击查看答案
第3题

A、decelerating when lowering the load  B、decelerating when raising the load  C、lowering the load at constant speed  D、raising the load at constant speed  

点击查看答案
第4题

A、A.designates the state of a commodity when the ship is heeled past the angle of repose  B、B.relates to the suitability of loading a cargo by flowing down inclined chutes  C、C.refers to the saturation of a dry bulk product with water to the point where it acts as a liquid  D、D.relates to the minimum granule size of a particular product where it will flow like a liquid at an angle of 30°  

点击查看答案
第5题

A、Create both jobs by using events raised by the scheduler  B、Create both jobs by using events raised by the application  C、Create a job to rebuild indexes by using events arised by the application and then create another job to perform bulk load by using events raised by the scheduler  D、Create a job to rebuild indexes by using events arised by the Scheduller and then create another job to perform bulk load by using events raised by the application  

点击查看答案
第6题

A、Create both jobs by using events raised by the scheduler  B、Create both jobs by using events raised by the application  C、Create a job to rebuild indexes by using events arised by the application and then create another job to perform bulk load by using events raised by the scheduler  D、Create a job to rebuild indexes by using events arised by the Scheduler and then create another job to perform bulk load by using events raised by the application  

点击查看答案
第7题

A、A.survey planning document  B、B.muster lists  C、C.bulk carrier booklet  D、D.bulk carrier loading triangle  

点击查看答案
第8题

A、A.at small angles of inclination  B、B.when loaded with minimum deck load  C、C.when at transit draft  D、D.when GZ is zero  

点击查看答案
第9题

A、only when the load is taken off the cable  B、only when there is a load on the cable  C、only when activated by the controls at the lowering station  D、at any time  

点击查看答案
第10题

A、only when the load is taken off the cable  B、only when there is a load on the cable  C、only when activated by the controls at the lowering station  D、at any time  

点击查看答案
客服
TOP

请使用微信扫码支付

订单号:
遇到问题请联系在线客服