The deck control valve to be()after being repaired.
A、moved and fitted again
B、removed and refitted
C、reproduced and put on again
D、returned and attached again
A、moved and fitted again
B、removed and refitted
C、reproduced and put on again
D、returned and attached again
A、The deck below the lower deck is known as ‘tween deck. B、The deck below the main deck is known as ‘tween deck. C、The deck above the main deck is known as ‘tween deck. D、The deck below the lower deck is known as main deck.
A、The deck is divided into forecastle deck, main deck and poop deck. B、The deck is divided into forecastle deck, lower deck and main deck. C、The deck is divided into forecastle deck, main deck and lower deck. D、The deck is divided into main deck, lower deck and poop deck.
A、The deck from bow to stern is called the main deck. B、The deck from stern to bow is called the tweendeck. C、The deck from bow to stern is called the upper deck. D、The deck from stern to bow is called the lower deck.
A、lower most continuous deck not broken by water tight bulkheads B、after most weather deck above the main strength deck C、upper or weather deck above the main strength deck D、deck of light construction below the main or strength deck
A、lower most continuous deck not broken by water tight bulkheads B、after most weather deck above the main strength deck C、upper or weather deck above the main strength deck D、deck of light construction below the main or strength deck
A、lower most continuous deck not broken by water tight bulkheads B、after most weather deck above the main strength deck C、upper or weather deck above the main strength deck D、deck of light construction below the main or strength deck
A、weld pad eyes on deck in proper position to secure the cargo B、strengthen the main deck by placing pillars underneath it in the tween-decks C、distribute the weight of the cargo by placing fore-and-aft planks on the main deck D、package the cargo in wooden crates so it will not damage the deck
A、weld pad eyes on deck in proper position to secure the cargo B、strengthen the main deck by placing pillars underneath it in the tween-decks C、distribute the weight of the cargo by placing fore-and-aft planks on the main deck D、package the cargo in wooden crates so it will not damage the deck
A、combustion control air system B、supply air system C、ships service air system D、low pressure deck air system