搜题
用户您好, 请在下方输入框内搜索其它题目:
搜题
题目内容 (请给出正确答案)
提问人:网友 发布时间:
【单选题】

Before any loading takes place any signs of the previous cargo should do().

A、kept

B、removed

C、replaced

D、recycled

更多“Before any loading takes place any signs of the previous cargo should do().”相关的问题
第1题

A、maximum sustained vertical load an anchor will resist before dragging  B、maximum sustained horizontal load an anchor will resist before dragging  C、maximum sustained vertical load an anchor will resist before the mooring line breaks  D、maximum sustained horizontal load an anchor will resist before the mooring line breaks  

点击查看答案
第2题

A、loading  B、load  C、loaded  D、loads  

点击查看答案
第3题

A、After loading and discharging, hatch covers will be opened.  B、After loading and discharging, hatch covers will be closed.  C、Before loading and discharging, hatch covers will be opened.  D、Before loading and discharging, hatch covers will be closed.  

点击查看答案
第4题

A、A.pick up more of any increase in load  B、B.pick up less of any increase in load  C、C.share an equal amount of any increase in load  D、D.drop an equal amount of any decrease in load  

点击查看答案
第5题

A、before the gripes are removed  B、before loading the passengers  C、after loading the passengers  D、after the boat is afloat  

点击查看答案
第7题

A、load replace last-active  B、load rollback 1  C、rollback 1  D、rollback last-active  

点击查看答案
客服
TOP

请使用微信扫码支付

订单号:
遇到问题请联系在线客服