搜题
用户您好, 请在下方输入框内搜索其它题目:
搜题
题目内容 (请给出正确答案)
提问人:网友 发布时间:
【单选题】

The present voyage of my ship began at the port of Shanghai after loading 8000 tons of cargo on board and ended after discharging the cargo at the port of Hong Kong, which is().

A、the port of destination

B、the next port of call

C、the port of arrival

D、the last port of call

更多“The present voyage of my ship began at the port of Shanghai after loading 8000 tons of cargo on board and ended after discharging the cargo at the port of Hong Kong, which is().”相关的问题
第1题

A、A. We dismantle the jumbo boom twice a voyage.  B、B. We dismantle the derricks once a voyage.  C、C. We examine the derricks once a voyage.  D、D. We dismantle the heavy derricks once a voyage.  

点击查看答案
第3题

A、A.before the conclusion of the voyage  B、B.after the conclusion of the voyage  C、C.as soon as the expenditure occurs  D、D.before or after the conclusion of the voyage  

点击查看答案
第5题

A、Voyage repair  B、Annual repair  C、Periodical repair  D、Survey check  

点击查看答案
第6题

A、engine room logbook  B、voyage logbook  C、engine room logbook or voyage logbook  D、engine room logbook and voyage logbook  

点击查看答案
客服
TOP

请使用微信扫码支付

订单号:
遇到问题请联系在线客服