The boom stops are installed on an offshore crane to().

A、prevent the boom from being raised too high

B、prevent the boom from swinging

C、support the boom when not in use

D、prevent the boom from being lowered

更多“The boom stops are installed on an offshore crane to().”相关的问题
第1题

A、Directly under the boom  B、Moving away from the boom  C、Stopped dead in the water  D、Tied to the boom  

点击查看答案
第2题

A、directly under the boom  B、moving away from the boom  C、stopped dead in the water  D、tied to the boom  

点击查看答案
第3题

A、Stopping the boom  B、Topping or lowering the boom  C、Moving the boom left or right  D、All of the above  

点击查看答案
第4题

A、vertical position  B、horizontal position  C、boom stop angle  D、minimum radius angle  

点击查看答案
第6题

A、being raised too high  B、swinging at sea  C、overloading when not in use  D、being lowered too low  

点击查看答案
第7题

A、auxiliary guys  B、extra fair leads  C、steel bands  D、stops  

点击查看答案
第8题

A、auxiliary guys  B、extra fair leads  C、steel bands  D、stops  

点击查看答案
第9题

A、A.the lubricating pumps are stopped and the access doors are opened  B、B.the lubricating pumps are running and the access doors are opened  C、C.the engine is running and the access doors are closed  D、D.the engine is stopped and the access doors are closed  

点击查看答案