搜题
用户您好, 请在下方输入框内搜索其它题目:
搜题
题目内容 (请给出正确答案)
提问人:网友 发布时间:
【单选题】

Tape streaming is not happening while performing RMAN tape backup. On investigation, you find that it is not because of the incremental backup or the empty file backup and that RMAN is sending data blocks to the tape drive fast enough.<br /> What could be a solution to make tape streaming happen during the backup?()

A、Configure backup optimization

B、Configure the channel to increase MAXOPENFILES

C、Configure the channel to increase the capacity with the RATE parameter

D、Configure the channel to adjust the tape buffer size with the BLKSIZE option

更多“ Tape streaming is not happening while performing RMAN tape backup. On investigation, you find that it is not because of the incremental backup or the empty file backup and that RMAN is sending data blocks to the tape drive fast enough.<br /> What could be a solution to make tape streaming happen during the backup?()”相关的问题
第1题

A、Configure backup optimization&nbsp;&nbsp;B、Configure the channel to increase MAXOPENFILES&nbsp;&nbsp;C、Configure the channel to increase the capacity with the RATE parameter&nbsp;&nbsp;D、Configure the channel to adjust the tape buffer size with the BLKSIZE option&nbsp;&nbsp;

点击查看答案
第2题

A、&ensp;Configure&ensp;backup&ensp;optimization&nbsp;&nbsp;B、&ensp;Configure&ensp;the&ensp;channel&ensp;to&ensp;increase&ensp;MAXOPENFILES&nbsp;&nbsp;C、&ensp;Configure&ensp;the&ensp;channel&ensp;to&ensp;increase&ensp;the&ensp;capacity&ensp;with&ensp;the&ensp;RATE&ensp;parameter&nbsp;&nbsp;D、&ensp;Configure&ensp;the&ensp;channel&ensp;to&ensp;adjust&ensp;the&ensp;tape&ensp;buffer&ensp;size&ensp;with&ensp;the&ensp;BLKSIZE&ensp;option&nbsp;&nbsp;

点击查看答案
第3题

A、The tape I/O performed is asynchronous&nbsp;&nbsp;B、The tape buffer is allocated from the System Global Area (SGA)&nbsp;&nbsp;C、The tape buffer is allocated from the Program Global Area (PGA)&nbsp;&nbsp;D、Oracle I/O uses an interrupt mechanism to determine when each I/O completes&nbsp;&nbsp;

点击查看答案
第4题

A、The tape I/O performed is asynchronous&nbsp;&nbsp;B、The tape buffer is allocated from the System Global Area (SGA)&nbsp;&nbsp;C、The tape buffer is allocated from the Program Global Area (PGA)&nbsp;&nbsp;D、Oracle I/O uses an interrupt mechanism to determine when each I/O completes&nbsp;&nbsp;

点击查看答案
第5题

A、A.&ensp;The&ensp;tape&ensp;I/O&ensp;performed&ensp;is&ensp;asynchronous&nbsp;&nbsp;B、B.&ensp;The&ensp;tape&ensp;buffer&ensp;is&ensp;allocated&ensp;from&ensp;the&ensp;System&ensp;Global&ensp;Area&ensp;(SGA)&nbsp;&nbsp;C、C.&ensp;The&ensp;tape&ensp;buffer&ensp;is&ensp;allocated&ensp;from&ensp;the&ensp;Program&ensp;Global&ensp;Area&ensp;(PGA)&nbsp;&nbsp;D、D.&ensp;Oracle&ensp;I/O&ensp;uses&ensp;an&ensp;interrupt&ensp;mechanism&ensp;to&ensp;determine&ensp;when&ensp;each&ensp;I/O&ensp;completes&nbsp;&nbsp;

点击查看答案
第6题

A、7&ensp;-&ensp;LTO&ensp;tape&ensp;drives&ensp;and&ensp;7&ensp;-&ensp;TS1130&ensp;tape&ensp;drives&ensp;&nbsp;&nbsp;B、10&ensp;-&ensp;TS1130&ensp;tape&ensp;drives&ensp;and&ensp;10&ensp;-&ensp;3592&ensp;tape&ensp;drives&ensp;&nbsp;&nbsp;C、16&ensp;-&ensp;3592&ensp;tape&ensp;drives&ensp;or&ensp;16&ensp;-&ensp;LTO&ensp;tape&ensp;drives&ensp;&nbsp;&nbsp;D、12&ensp;-&ensp;LTO&ensp;tape&ensp;drives&ensp;or&ensp;12&ensp;-&ensp;3592&ensp;tape&ensp;drives&nbsp;&nbsp;

点击查看答案
第7题

A、&ensp;RC4&ensp;is&ensp;a&ensp;stream&ensp;cipher&nbsp;&nbsp;B、&ensp;Stream&ensp;ciphers&ensp;require&ensp;padding&nbsp;&nbsp;C、&ensp;AES&ensp;is&ensp;a&ensp;block&ensp;cipher&nbsp;&nbsp;D、&ensp;DES&ensp;and&ensp;3DES&ensp;are&ensp;stream&ensp;ciphers&nbsp;&nbsp;E、&ensp;AES&ensp;is&ensp;a&ensp;stream&ensp;cipher&nbsp;&nbsp;F、&ensp;AES,&ensp;DES,&ensp;and&ensp;3DES&ensp;can&ensp;be&ensp;used&ensp;as&ensp;HMAC&ensp;algorithms&nbsp;&nbsp;

点击查看答案
第8题

A、North Cape Current&nbsp;&nbsp;B、Labrador Current&nbsp;&nbsp;C、Greenland Current&nbsp;&nbsp;D、North Atlantic Current&nbsp;&nbsp;

点击查看答案
第9题

A、A. requestTechline support for help configuring the TS3500 with merged IBM and non-IBM LTO tape drives&nbsp;&nbsp;B、B. propose a TS3500 with IBM LTO-5 tape drives and explain the benefit of using IBM control path failover&nbsp;&nbsp;C、C. propose a TS3500 with IBM LTO-5 tape drives and include a special feature code to include non-IBM LTO tape drives&nbsp;&nbsp;D、D. propose a TS3500 with LTO-5 tape drives and include non-IBM LTO tape drive support in the installation services proposal&nbsp;&nbsp;

点击查看答案
客服
TOP

请使用微信扫码支付

订单号:
遇到问题请联系在线客服