搜题
用户您好, 请在下方输入框内搜索其它题目:
搜题
题目内容 (请给出正确答案)
提问人:网友 发布时间:
【单选题】

The designed () is 20 tons per day, but the fresh water generator can only distil 15 tons at present.

A、displacement

B、weight

C、power

D、capacity

更多“The designed () is 20 tons per day, but the fresh water generator can only distil 15 tons at present.”相关的问题
第1题

A、Design 1 is a looped triangle design.  B、Design 2 is a looped triangle design.  C、Design 2 achieves quick convergence using RSTP.  D、Both designs supportstateful services at the aggregation layer.  E、Design 2 is the most widely deployed in enterprise data centers.  

点击查看答案
第2题

A、The access layer is the first oversubscription point in a data center design.  B、When using a Layer 2 loop-free design, VLANs are extended into the aggregation layer.  C、When using a Layer 2 looped design, VLANs are not extended into the aggregation layer.  D、When using a Layer 3 design,stateful services requiring Layer 2 connectivity are provisioned from the aggregation layer.  E、The data center access layer provides the physical-level connections to the server resources and only operates at Layer 3.  

点击查看答案
第3题

A、when HSRP is not supported by the design  B、when multiple vendor devices need to be supported  C、when preempt tuning of the default gateway is needed  D、when a robust method of backing up the default gateway is needed  E、when the design implements Layer 2 between the access switch and the distribution switch  F、when the design implements Layer 3 between the access switch and the distribution switch  

点击查看答案
第4题

A、A.This switch has more than one interface connected to the root network segment in VLAN 2.  B、B.This switch is running RSTP while the elected designated switch is running 802.1d Spanning Tree.  C、C.This switch interface has a higher path cost to the root bridge than another in the topology.  D、D.This switch has a lower bridge ID for VLAN 2 than the elected designated switch.  

点击查看答案
第5题

A、OSPF is not supported by the design  B、HSRP is not supported by the design  C、preempt tuning of the default gateway is needed  D、the design implements Layer 3 between the access switch and the distribution switch  

点击查看答案
第6题

A、Troubleshooting is more complicated.  B、Service and switch modules are underutilized.  C、Layer 2 adjacency is required with the servers that use this design.  D、Layer 3 adjacency is required with the servers that use this design.  E、Load balancing will always occur across both access layer uplinks.  

点击查看答案
第7题

A、Before the first solution design meeting with the customer  B、After the solution design proposal is submitted to manufacturing for review  C、Once the customer has supplied the solution design specifications to the sales team  D、After the solution design is completed and before the proposal is submitted to the customer  

点击查看答案
第8题

A、Cisco is focusing on Cisco Validated Designs as a means to driving integrated networks.  B、Cisco is focusing on the PIN architecture as a means to driving integrated networks.  C、The Cisco PIN architecture is a critical mechanism for supporting integrated markets because it can be implemented quickly.  D、The Cisco Validated Designs program provides critical mechanisms for supporting integrated markets because the mechanisms can be implemented quickly.  E、Cisco Validated Designs can be implemented quickly without customer input.  

点击查看答案
第9题

A、Cisco is focusing on Cisco Validated Designs as a means to driving integrated networks.  B、Cisco is focusing on the PIN architecture as a means to driving integrated networks.  C、The Cisco PIN architecture is a critical mechanism for supporting integrated markets because it can be implemented quickly.  D、The Cisco Validated Designs program provides critical mechanisms for supporting integrated markets because the mechanisms can be implemented quickly.  E、Cisco Validated Designs can be implemented quickly without customer input.  

点击查看答案
客服
TOP

请使用微信扫码支付

订单号:
遇到问题请联系在线客服