Prior to starting an AC generator prime mover, the voltage regulator cutout switch should be placed in the ()
A、manual position
B、bus neutral position
C、raise voltage position
D、transfer position
A、manual position
B、bus neutral position
C、raise voltage position
D、transfer position
A、a lifeboat drill be held within 12 hours prior to departure B、fire pumps be tested by starting within 12 hours prior to departure C、the emergency generator and lighting system be tested by starting and operating within 12 hours prior to departure D、the entire steering gear be tested within 12 hours prior to departure
A、A.check cylinder lubrication prior to starting engine B、B.connect exhaust gas analyzers to determine engine efficiency C、C.pressure test cylinder heads to check for leaks D、D.remove moisture accumulations from cylinder prior to starting
A、an air bound fuel system B、damage to cylinder heads and pistons C、excessive fuel injection D、excessive air valve lift
A、the tunnel end point B、the tunnel start point C、a specific node to be traversed D、the node prior to the tunnel end point
A、The adapter must be taken offline prior to the firmware update. B、The system has not been rebooted since the adapter was added to the LPAR. C、The adapter must be assigned to the service partition prior to updating the firmware. D、The adapter must be dynamically removed from the LPAR prior to updating thefirmware.
A、Pre-lube cylinders with hand cranks B、Open all air space drain cocks C、Open all indicator valves D、All of the above
A、Open a vterm from the VIO graphical interface to get the partition console. B、Open a vterm from the ASMI graphical interface to get the partition console. C、Start an ssh session to the HMC. Use the vtmenu command to select the desired LPAR. D、Start an ssh session to the VIO. Use the vtmenu command to select the desired LPAR.