搜题
用户您好, 请在下方输入框内搜索其它题目:
搜题
题目内容 (请给出正确答案)
提问人:网友 发布时间:
【单选题】

A PC is powered on and begins POST. The PC takes a long time when scanning for drives. The BIOS reports no hard drive can be found but the CD-ROM is identified. The technician knows that there are two hard drives on the primary EIDE controller and a CD-ROM on the secondary EIDE controller.<br /> Which of the following is the MOST likely cause of the problem?()

A、Both hard drives have the master jumper in place.

B、One hard drive is set as master and the other slave.

C、The hard drive data cable is reversed.

D、Both hard drives have the cable select jumper in place.

更多“ A PC is powered on and begins POST. The PC takes a long time when scanning for drives. The BIOS reports no hard drive can be found but the CD-ROM is identified. The technician knows that there are two hard drives on the primary EIDE controller and a CD-ROM on the secondary EIDE controller.<br /> Which of the following is the MOST likely cause of the problem?()”相关的问题
第1题

A、Set the clear password jumper on the motherboard  B、Enter the BIOS setup and select the clear password setting  C、Remove the power cord from the power supply and then plug it back in  D、Power cycle the PC  E、Remove the CMOS battery for 15 minutes  

点击查看答案
第2题

A、The voltage selector switch on the power supply is set incorrectly.  B、The 3.3v power line is connected to the wrong input on the motherboard.  C、The new power supply voltage rating is too high.  D、The 12v power cord is installed incorrectly.  

点击查看答案
第3题

AA. Change the BIOS settings to the local time  B、B. Adjust the voltage selector switch  C、C. Attach a 220 volt power strip from the current region to the PC  D、D. Attach a 120 volt battery backup power supply to the PC  

点击查看答案
第5题

A、Ensure the /etc/auto_start file exists on the VIOS.  B、Ensure the 'cfgdev -a boot=yes' command has been executed.  C、Select the 'Automatically start when the managed system is powered on' option within the VIO Server LPAR profile.  D、Add the VIO Server to the 'Automatically start when the managed system is powered on' field on the Managed System properties.  

点击查看答案
第6题

A、The LCD monitor’s power inverter does not function properly.  B、The operating system’s power settings prevent the battery from charging.  C、The battery is not compatible with the laptop.  D、The internal power connection on the motherboard is faulty.  E、The power adapter is not working.  

点击查看答案
第9题

A、Continue plugging into the central UPS, but put the UPS on bypass to avoid load problems.  B、Plug the servers directly into the power that is not on the UPS.  C、Add stand alone UPSs for new servers not wired off the central UPS.  D、Continue plugging into the central UPS because the actual load supported is actually higher than stated  

点击查看答案
客服
TOP

请使用微信扫码支付

订单号:
遇到问题请联系在线客服