搜题
用户您好, 请在下方输入框内搜索其它题目:
搜题
题目内容 (请给出正确答案)
提问人:网友 发布时间:
【单项选择题】

LOADING SITUATION OF SUB VSL SO FAR SATISFACTORY. AS PER PORT GENERALARRANGEMENT SHE WILL SHIFT TO ANOTHER BERTH TO CONTINUE HER LOADING THIS NOON. HER BEST ETD 2400HRS TONIGHT. According to this telex,()is not mentioned.

A、A.the vessel will shift to another berth

B、B.loading is in normal progress

C、C.she is expected to leave 2400 tonight

D、D.the arrangement of her loading operations is far from satisfactory

更多“LOADING SITUATION OF SUB VSL SO FAR SATISFACTORY. AS PER PORT GENERALARRANGEMENT SHE WILL SHIFT TO ANOTHER BERTH TO CONTINUE HER LOADING THIS NOON. HER BEST ETD 2400HRS TONIGHT. According to this telex,()is not mentioned.”相关的问题
第1题

A、cast iron has weakness  B、cast iron can stand up shock loading  C、cast iron fittings are only suitable in low pressure situation  D、east iron fittings are not suitable in low pressure situation  

点击查看答案
第2题

A、Draft and trim  B、Limits of the bending moments  C、Rate of discharging  D、Rate of loading  

点击查看答案
第3题

A、checking the loading sheet  B、loading to within 1 percent of outage  C、loading to within 10 percent of the safety relief valve setting  D、filling to the maximum level indicated on the liquid level gaging device  

点击查看答案
第4题

A、available dunnage,and chocking  B、crushability,and inherent vice  C、sweat,and weight  D、weight,and refrigeration  

点击查看答案
客服
TOP

请使用微信扫码支付

订单号:
遇到问题请联系在线客服