搜题
用户您好, 请在下方输入框内搜索其它题目:
搜题
题目内容 (请给出正确答案)
提问人:网友 发布时间:
【单选题】

The load chart of a ship crane enables the operator to combine the load radius with boom length to determine the().

A、maximum counter weight required

B、minimum horsepower required

C、hoist rope strength

D、allowable load

更多“The load chart of a ship crane enables the operator to combine the load radius with boom length to determine the().”相关的问题
第2题

A、boom angle  B、boom strength  C、load radius  D、cable strength  

点击查看答案
第3题

A、maximum counter weight required  B、minimum horsepower required  C、hoist rope strength  D、allowable load  

点击查看答案
第4题

A、Top center  B、Lower-left corner  C、Part of the chart title  D、Any clear area around the neat line  

点击查看答案
第5题

A、vertical distance from the chart sounding datum to the ocean bottom,plus the height of tide  B、vertical distance from the chart sounding datum to the ocean bottom  C、average height of water over a specified period of time  D、average height of all low waters at a place  

点击查看答案
第6题

A、Gray lines on the uppermost inset chart  B、Red lines on the main body of the chart  C、In parenthesis on the lines of equal magnetic variation  D、Annual rate of change is not shown  

点击查看答案
第7题

A、Gray lines on the uppermost inset chart  B、Red lines on the main body of the chart  C、In parenthesis on the lines of equal magnetic variation  D、Annual rate of change is not shown  

点击查看答案
第8题

A、sailing chart  B、general chart  C、coastal chart  D、harbor chart  

点击查看答案
第9题

A、sailing chart  B、general chart  C、coastal chart  D、harbor chart  

点击查看答案
客服
TOP

请使用微信扫码支付

订单号:
遇到问题请联系在线客服