All bilge suction must be fitted with suitable (), which in the machinery space would be mud boxes positioned at floor-plate level for easy access.
A、strainers
B、valves
C、elements
D、separators
A、strainers
B、valves
C、elements
D、separators
A、A.excessive water in the bilges B、B.a clogged suction strainer C、C.oil in the bilges D、D.All of the above
A、the circuit breaker B、for leaks in the suction piping C、relief valve is not properly seated D、the suction strainer
A、to inject cleaning additives when the bilges are extremely dirty B、when the main condenser becomes fouled, in order to provide additional cooling water circulation C、to connect the rose box to the independent bilge suction D、if the bilges become flooded and they can not be emptied by any other means
A、stop-check valves installed in the bilge manifolds B、using a positive displacement reciprocating bilge pump C、installing eductors in all bilge rose boxes D、installing a swing check before each bilge valve