Once the port has been named and accepted by,or on behalf of,the Shipowner,he can not afterwards refuse to go()__ on the ground that it is not safe.
A、A.where
B、B.there
C、C.which
D、D.that
A、A.where
B、B.there
C、C.which
D、D.that
A、VLANs have not been created yet B、An IP address must be configured for the port C、The port is currently configured for access mode D、The correct encapsulation type has not been configured E、The no shutdown command has not been entered for the port
A、for FP, once fitted, the position of the blades can also be changed in operation B、for CP, once fitted, the position of the blades can also be changed in operation C、the CP type has a relatively smaller hub compared with the FP propellers D、the FP type has a relatively larger hub compared with the CP propellers
A、The switch port link lights will be off on both switches indicating the ports are not connected. B、The switch port link light will be off on one switch indicating that STP has disabled the port. C、The switch port link lights will flash amber indicating an error. D、The switch port link lights will be green indicating normal operation.
A、At least one fire and drill shall be held within 24 hours of leaving a port where more than 25 percent of the crew has been replaced B、The Master is responsible in seeing thst each lifeboat is lowered to the water at least once in each 6 months C、Lifeboat equipment shall be examined at least once each month to insure that it is complete D、An entry shall be made in the vessels official Logbook relative eo each fire and boat drill
A、At least one fire and boat drill shall be held within 24 hours of leaving a port where more than 25 percent of the crew has been replaced B、The Master is responsible in seeing that each lifeboat is lowered to the water at least once in each 6 months C、Lifeboat equipment shall be examined at least once each month to insure that it is complete D、An entry shall be made in the vessel's Official Logbook relative to each fire and boat drill
A、A.Dual power supplies. B、B.Twice the amount of disk. C、C.Two dual-port LHEA adapters. D、D.Two dual-port fibre channel adapters.
A、The testing of the internal combustion engine driven emergency generator at least once each month the vessel is navigated B、The testing of storage betteries for emergency lighting and systems once each 6 months the vessels is navigated C、The actual draft when the vessel arrives in salt water after department a port D、The testing of the line-throwing appliance once every 3 months