According to the news, ETS is<br/>A.meant<br/>B.<br/>B.given<br/>C.<br/>C.believed<br/>D.<br/>D.welcomed<br/>E.<br/>
A、A.meant
B.
B.given
C.
C.believed
D.
D.welcomed
E.
A、A.meant
B.
B.given
C.
C.believed
D.
D.welcomed
E.
A、starting and direction changing trial B、cancelling accelerating function trial C、lowest stable speed trial D、continuous running trial
A、Instruct Marie to run the ipconfig /flushdns command on her new computer and to add the new computer to the domain by using the same computer name as her failed computer. B、Assign Marie permissions for adding computer accounts to the default container named Computers. Instruct Marie to add her new computer to the domain. C、Reset the computer account for Marie's failed computer. Instruct Marie to add her new computer to the domain by using the same name as her failed computer. D、Configure the IP address of Marie's new computer to be the same as the failed computer. Instruct Marie to add the new computer to the domain.
A、Name the new server File2. Create a new mirrored volume by using two 72-GB disks. Connect File2 to the network and copy the data from File1. When copying is complete, shut down the old File1. B、Name the new server File1. Move both disks from the old File1 to the new File1. Scan the disks for changes. Import the disks. Connect the new File1 to the network. C、Name the new server File1. Break the mirror on the old File1. Move one of the disks from the old File1 to the new File1. Scan the disk for changes. Initialize the disk. Select the spare disk and create the mirror. Connect the new File1 to the network. D、Name the new server File1. Remove one of the disks in the mirror from the old File1. Move the disk to the new File1. Scan the disk for changes. Import the disk. Shut down the old File1 and connect the new File1 to the network.
A、A.An additional switch for the new HMC B、B.Asynchronous adapters on the new HMC C、C.The two 570 servers are directly connected to the new HMC D、D.One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC
A、Name the new server File2. Create a new mirrored volume by using two 72-GB disks. Connect File2 to the network and copy the data from File1. When copying is complete, shut down the old File1. B、Name the new server File1. Move both disks from the old File1 to the new File1. Scan the disks for changes. Import the disks. Connect the new File1 to the network. C、Name the new server File1. Break the mirror on the old File1. Move one of the disks from the old File1 to the new File1. Scan the disk for changes. Initialize the disk. Select the spare disk and create the mirror. Connect the new File1 to the network. D、Name the new server File1. Remove one of the disks in the mirror from the old File1. Move the disk to the new File1. Scan the disk for changes. Import the disk. Shut down the old File1 and connect the new File1 to the network.