搜题
用户您好, 请在下方输入框内搜索其它题目:
搜题
题目内容 (请给出正确答案)
提问人:网友 发布时间:
【单选题】

Main engines as well as auxiliary engines operating on heavy fuel should have continuous on the lubricating oil, either according to the bypass or batch principles()

A、filtering

B、centrifuging

C、depositing

D、operating

更多“Main engines as well as auxiliary engines operating on heavy fuel should have continuous on the lubricating oil, either according to the bypass or batch principles()”相关的问题
第1题

A、A.an engine-driven;as well  B、B.an engine-driven;has an independent pump  C、C.an independent;as well  D、D.an independent;has an engine-driven pump  

点击查看答案
第2题

A、as close to the main engine as possible  B、as close to the main pump as possible  C、just before the fuel valve  D、just before the booster pump  

点击查看答案
第3题

A、100%  B、110%  C、85%  D、different  

点击查看答案
第4题

A、Slow speed diesel engines  B、Medium-speed diesel engines  C、Steam engines  D、Gasoline engines  

点击查看答案
第5题

A、engine trails should be done after finishing the operation of turning the engine with the turning gear and starting the engine on air briefly  B、in the operation of engine trails, the main engine should be running in low-speed  C、As to the ship equipment with twin main engine, engine trials should be done with one engine ahead and another engine astern at the same time  D、the order “engine trials” should be given by the bridge  

点击查看答案
第6题

A、reduce its speed  B、find out its trouble  C、eliminate its trouble  D、all the above  

点击查看答案
第7题

A、All officers  B、All engineers  C、All the crew  D、All sailors  

点击查看答案
第8题

A、Failure of proper operation of propulsion and other essential machinery, as well as electrical installation  B、Failure of the proper operation of the main and auxiliary steering gear  C、Failure of engineering watch arrangements to confirm to the requirements specified for the ship by Administration  D、Failure of the proper operation of emergency generator, lighting, batteries and switches  

点击查看答案
第9题

A、disengaging the clutch firstly, then stopping the main engine  B、stopping the main engine firstly, then disengaging the clutch  C、stopping the cooling water pump firstly, then stopping the main engine  D、stopping the main engine and disengaging the clutch at the same time  

点击查看答案
客服
TOP

请使用微信扫码支付

订单号:
遇到问题请联系在线客服